The processing process of elastic clamp includes installation preparation, rolling groove, opening and other processes, and the subsequent process also includes the installation of mechanical tee joint, and then the unified pressure regulation and detection of the pipeline.
Before processing, it is necessary to ensure the correct use of the hole opening machine and grooving machine, as well as the inspection of materials and tools to ensure the normal use of the equipment. There is also the need to install the pipe according to the design requirements.
Cut the steel pipe according to the required length with the pipe cutter, and check the incision section with the level meter to ensure that the cut section is vertical to the central axis of the steel pipe. If there is burr in the cut, it should be polished with a grinder.
The steel pipe that needs to be processed groove is erected on the grooving machine and the tailstock of the grooving machine, and leveled with a level gauge to make the steel pipe in a horizontal position.